    "整合矿井变化调度"
    "2010年7月27日"
    "专业分类","主体矿井","整合矿井","级别",,"变化地点","变化性质","变化时间","变化内容","管理措施","4点班","0点班","8点班"
    "生产变化","司马煤业公司","五里堠煤业","三级",,"总回风","有计划修巷","7月26日","总回风有计划修巷,巷道加固.","严格执行《总回风有计划修巷安全技术措施》"
    ,,"阜生煤业","三级",,"1107工作面","安装后溜","7月26日","1107工作面安装后溜.","按《1107工作面安装措施》执行"
    ,"王庄煤矿","黑龙关煤业","三级",,"主斜井","更换管路","7月26日","换管,接管,运管."
    ,,"伊田煤业","三级",,"伊田矿(一阶)轨道一段","有计划修巷","7月26日","轨道一段车场改造砌墙2米.","《轨道大巷修巷安全技术措施》"
    ,,,"三级",,"红道矿(关闭)集运大巷","有计划修巷","7月26日","集中运输大巷修巷架棚4架.","《集中运输巷道修巷安全技术措施》"
    ,,,"三级",,"北辅皮修巷","有计划修巷","7月26日","北辅皮修巷架棚5架.","《北辅皮修巷安全技术措施》"
    ,,"黑龙煤业","三级",,"主井","掘进","7月26日","主井掘进1.3M.","严格执行《主井管理措施》"
    ,,,"三级",,"副井","掘进","7月26日","副井掘进1.2M.","严格执行《副井管理措施》"
    ,"漳村煤矿","后堡煤业","三级",,"201采区回风巷","有计划修巷","7月26日","局部巷道挑顶,拉底,铺设轨道.","执行安全技术措施规定"
    ,,"和顺一缘煤业","三级",,"专用回风下山","巷道改造","7月26日","由原锚网支护变为料石砌碹.","严格按专用回风下山砌碹措施执行"
    ,"常村煤矿","温庄煤业","三级",,"150301综采工作面","推进","7月25日4点班至7月26日8点班","7月25日4点班割煤2刀,7月26日0点班割煤2刀,7月26日8点班检修,空巷位置在38架至40架;","1,正常执行《150301综采工作面回采作业规程》.2,安全指挥中心监督规程的执行情况.3,严格执行领导干部现场跟班制度."
    ,,,"三级",,"2#瓦斯泵站,150201回顺","贯通","7月25日4点班至7月26日8点班","7月25日4点班掘进一队在150201回顺拉底铺道15m,2#瓦斯泵站掘进6架,7月26日0点班在2#瓦斯泵站掘进6架,7月26日8点班在2#瓦斯泵站掘进6架,累计拉底铺道415m,累计在2#瓦斯泵站掘进96架,150201回顺铺道在7月25日4点班铺道完成,2#瓦斯泵站在7月26日8点班与集中回风巷贯通.","1,已编制《2#瓦斯泵站贯通安全技术措施》2,已编制《150201回顺铺道安全技术措施》"
    ,,,"三级",,"18#贯眼,15#贯眼","18#贯眼掘进,15#贯眼密闭","7月26日0点班至7月26日8点班","7月26日0点班密闭15#贯眼,7月26日8点班修巷队密闭15#贯眼,18#贯眼掘进4排,累计掘进16排14.4米.","1,已编制《18#贯眼掘进安全技术措施》2,已编制《15#贯眼密闭安全技术措施》"
    ,,"长喻河煤业","三级",,"正泰矿区080406工作面","回撤","7月26日","正泰矿区080406工作面当日出架6组,装运6组.","1,严格按照《080406综采工作面回撤作业规程》执行.2,矿领导现场跟班."
    "地质变化","常村煤矿","麦捷煤业","三级",,"310工作面","揭露小型地质构造","7月26日","310综采工作面68#架至84#架过褶曲构造,底板隆起最高处2米,最低0.2米.","1,严格按照《150310工作面过地质构造安全技术措施》执行."
    "通风变化","常村煤矿","温庄煤业","三级","√","2#瓦斯泵站","贯通","7月26日","当日12:57,2#瓦斯泵站与集中回风巷贯通."
    "监测监控","漳村煤矿","上庄煤矿","三级",,"井下探头","断电试验","7月27日 8:00—16:00","井下各作业地点做甲烷传感器断电试验","保证断电试验数据无误"
    "其他变化","常村煤矿","长喻河煤业","二级",,"正泰矿区1502运输巷","对安全生产存在较大威胁","7月26日","正泰矿区1502运输巷由于25#钻孔封堵情况不确定,停止掘进,焦作理工大学专家已进行了二次勘探,等待勘探报告.","现已聘请焦作理工大学专家进行勘探."